> What side effects are you referring to? Not sure what difference it
> would make considering the test ends after the commit.
Hi Mike,
I meant something else - if we are testing behavior of optimistic locking
when there is no underlying snapshot for object, using "invalidate" to
prepare such test setup has an undesired side effect on this test results.
Andrus
This archive was generated by hypermail 2.0.0 : Fri Mar 04 2005 - 10:14:26 EST