On 19/06/2008, at 1:29 AM, Andrus Adamchik wrote:
>> Maybe now is a good time to create 4.0 and 3.1 milestones and start
>> triaging tasks into those?
>
> You mean like a Wiki page (not an SVN branch)? Yeah sure we can do
> that.
I meant in Jira. I think the most important thing if we want to
release 3.0 is to not let feature creep allow the release to be
sidetracked. And one tool for that is Jira. Having all new tasks drop
into '4.0' by default and only be manually moved down into 3.0 is a
start.
Ari
-------------------------->